
On May 1, 2009, at 12:01 AM, the
Hood Canal Bridge was closed to traffic for an estimated six weeks.
You can also get updated traffic information
on the project traffic webpage and sign up for email traffic alerts about situations as they develop on alternate routes such as US 101 and SR 3.
Visit the
project Flickr page for pictures of the construction work, including the removal of old Bridge sections.
Intersection Status:
The intersection of Paradise Bay Road and SR 104 just west of the Bridge will be in operation during the closure. However, SR 104 will be closed 1.2 miles west of the Bridge, between Scenic View Lane and Garten Road, so that WSDOT can install a new culvert. The preferred route for detoured traffic will be SR 19 to Oak Bay Road to Paradise Bay Road. Local traffic may choose others routes, keeping in mind that SR 104 will be closed at that location (milepost 12.7).